Operation Management
Your current location is:HomepageOperation Management
Sunjiacha Longhua Mining Company’s drainage water comprehensive utilization project starts construction
Release time: 2022-06-08     Author: Ma Ruijun    Views: 11732
The water source protection project has improved the drinking water problem of residents in the mining area...Insist on green development
Longhua Mining Company Mine Drainage Water and Industrial Wastewater Comprehensive Utilization Project Started
A comprehensive treatment plant integrating urea industrial wastewater treatment system and reclaimed water comprehensive utilization system
“Our treated mine drainage water can meet the third category standard of the national “Groundwater Quality Standard”
Can effectively solve the drain water discharge problem and water resource waste problem that may be caused by the later increase in water inflow in Sunjiacha Longhua Coal Mine