Safe production
Your current location is:Homepage >> Safe production
Zhangjiamao Intelligence Center of Information Technology Operation and Maintenance Branch: Working hard to write the "Three M88 appPreventions" Safety Volume in the rainy season
Release time: 2022-06-21     Author: Qiao Jiao Guo Zhaozhao    Views: 9206    Share to:

配图.jpg

The rainy season is coming,In order to fully implement the superior company's "Notice on Carrying out Special Inspections on "Three Preventions" in the Rainy Season",Comprehensively carry out flood control in the rainy season、Lightning protection、Waterproof and drainage work,The Zhangjiamao Intelligent Maintenance Center of the Information Technology Operation and Maintenance Branch combines the experience of "three preventions" in the past rainy seasons,Prediction in weather forecast、Management of hidden dangers in electromechanical equipment、Coordinated deployment of flood control and drainage material supply and other aspects,Carefully write the "Three M88 appPreventions" Safety Volume during the rainy season。

Zhangjiamao Zhiwei Center has formulated the "three prevention" work plan and emergency plan for the rainy season based on actual conditions,Established as Director、Leading group with the deputy director as the main person in charge。Make the "three preventions" during the rainy season the current key task,Developed the work idea of ​​“Three Checks and Three Guarantees”,Just before the rain,Bao Industrial Zone、Communication room in living area、Network room、The drainage facilities in the distribution room are intact and stable;Cha Yuzhong,Bao Industrial Zone、Communication room in living area、Network room、The pipelines in the distribution room are smooth and the equipment is running normally;Cha Yuhou,Ensure the safety of on-site mechanical and electrical equipment and drainage facilities,Implementing hierarchical control of the "three preventions" during the rainy season。Follow the weather forecast in real time,Prevention of sudden showers,Strictly implement the 24-hour duty system,Report and handle problems in a timely manner,Ensure the effective implementation of the "three preventions" work during the rainy season。

Carry out special m88 reviewrectification and management of key areas for daily maintenance of underground underground mines,Ensure smooth flow of difficult drainage areas during the rainy season,Convert equipment to hidden dangers、Nip the problem of congestion in drainage pipes in the bud in advance。At the same time,Require the person in charge of each system to be familiar with the operation methods of drainage facilities in each system equipment area,Promptly carry out strong drainage after water accumulation。

In order to achieve rapid response to flood prevention、Lightning protection、Purpose of waterproofing and drainage,Zhangjiamao Zhiwei Center prepares waterproof materials in key locations,Organize a dedicated person to take stock of the materials needed for on-site flood prevention、Maintenance,Check and fill in gaps,Require the warehouse to prepare spare supplies。In addition,The center conducts coding and classification management of flood prevention items,Implement dedicated personnel for dedicated management,Ensure supplies are complete、Intact,Be fully prepared for the arrival of heavy rainfall during the flood season。(Author: Qiao Jiao Guo Zhaozhao  Editor: Wang Yu)