September 28,The water and m88 online sports betting conservation plan report of Longhua Technology Company’s coal classification, quality, clean, efficient and comprehensive utilization project passed the approval of the water conservancy department。
Reply opinion,The preparation of the water and soil conservation plan for this project complies with the national soil and m88 online sports betting laws and regulations and the requirements of the "Technical Specifications for Water and Soil Conservation in Development and Construction Projects"。As understood,The water and soil erosion prevention and control standards of this project comply with the first-level standards of the Northwest Loess Plateau District,The water and soil loss prevention and control target in the design level year is 93% water and soil loss control degree、Soil loss control ratio 1.0、Drag protection rate 92%、Forest and grass vegetation recovery rate 95%、Forest and grass coverage rate 15%。
This project is located in Yanjiata Area, Lantan Industrial Characteristic Park, Shenmu City。The project consists of 500,000 tons/year ammonia synthesis、800,000 tons/year urea、60,000 tons/year melamine、2X500,000 tons/year acetic acid and related public works composition。Total project land area 93.00hm3,Total investment is 7.07 billion yuan,Of which the total investment in soil and m88 online sports betting is 676.760,000 yuan。
Next step,Longhua Technology Company will follow the approval requirements,Implementation management organization、Personnel、Funding and safeguards,And follow the approved soil and m88 online sports betting plan,Do a good job in preliminary design of soil and m88 online sports betting and other follow-up work,Strengthening construction organization and management,Effectively implement the “Three Simultaneities” system for soil and m88 online sports betting。Soil and m88 online sports betting plan approved,will provide important guarantee for the construction of the project in compliance with laws and regulations,Laying a solid foundation to fully promote the "acceleration" of project construction。(Author: Wang Jiaolong Editor: Wang Yu)