The highest tower of the purification device of the Longhua Technology Company project has been hoisted
Release time: 2023-05-18     Author: Wang Dongyang    Views: 4186    Share to:

May 14, 9:00 am,The 4th section of the purification device transformation scrubber (C033001) of the coal classification, quality, clean, efficient and comprehensive utilization project of Longhua Technology Company was successfully hoisted,Equipment safely in place,marks the successful completion of another "300 days of hard work M88 appand decisive victory in 1130 CCCC" node goal of the project in May。

640.jpg

The 4th section of the shift gas scrubber (C033001) hoisted this time is the core equipment of the low-temperature methanol washing unit of the company's purification device,Total equipment weight 165 tons,Tower height 89.92 meters。The equipment is hoisted using a 1250-ton main crane、400-ton crane slides back。

“Tower hoisting is the biggest difficulty in the installation phase of the purification device,The completion of this hoisting marks that the construction of the purification device has entered a new stage,Laid the foundation for achieving the ‘1130’ CCCC goal。" Liu Jianjun, project manager of Hualu Company, said with confidence。

It is reported,The purification device of this project will be constructed in July 2022,General contractor by Hualu Technology Company,Sinochem 14th Construction Installation and Construction。This device fully implements soilless construction,Further improved construction efficiency and civilized M88 loginconstruction management。

At present, the installation rate of this purification device exceeds 80%,Pipeline welding installation rate exceeds 50%,The overall progress of the purification device has reached 70%。Smooth hoisting of the tower,Won valuable time for hoisting other towers,Also for the installation of process pipelines for purification devices、The comprehensive closure of the steel structure pipe gallery has laid a solid foundation。

Longhua Technology Company Engineering and Construction Department、Integrity Supervision Company、Hualu Technology Company, the general contractor of the installation、Large lifting company、Construction Contractor、On-site engineering management personnel and construction personnel participated in the hoisting ceremony。(Wang Dongyang)