m88 casino
Operation Management
Your current location is:HomepageOperation Management
Comprehensive excavation team of Hanjiawan Coal Company: reducing costs and increasing efficiency
Release time: 2023-10-18     Author: Deng Longqian Deng Zhiqi    Views: 3364

20 anchor cables...in the computer of Bai Gang, the leader of the comprehensive excavation team of Hanjiawan Coal Company

This is a lens through which the comprehensive excavation team continues to reduce costs and increase efficiency

88.png

Catch your thoughts and work hard on the word "fine"

Carried out exchanges and discussions on the theme of "How to reduce costs and increase efficiency"

Excellent practices for reducing costs and increasing efficiency in other units

Grasp supervision and make a fuss about the word "management"

The inspector and material clerk report the consumption of various materials in the group every shift

Promptly store the waste drill pipes generated after excavation support into groups

Strive for innovation and seek breakthroughs in the word "smart"

Zhang Bo and Liu Jun are welding angle iron with sweat dripping down their backs

"Zhang Lulu, the material clerk on the side, gave a thumbs up

The district team has applied for more than 10 innovative projects in total