Operation Management
Your current location is:Homepage >> Operation Management
On this day, we witness the speed of Longhua together
Release time: 2023-12-01     Authors: Xue Zhuang Meng Xiaoyong m88 casino reviewGuo Guangyao Guo Yuxi Xue Xiaocheng Wang Jiaming    Views: 4024    Share to:

Riding the wind from all directions,In response to everyone’s expectations。The morning of November 30th,Welcome to the mechanical completion ceremony of the main equipment of the Longhua Technology Company's coal classification, quality, clean, efficient and comprehensive utilization project and the handover ceremony of some equipment。

Member of the Standing Committee of Shenmu Municipal Committee、Liu Xiaobo, Executive Vice Mayor of the Municipal Government,Deputy Director of the Management Committee of Shenmu Lantan Industrial Park、Li Yongzhi, Secretary of the Party Committee of Sunjiacha Town,Fang Shangpeng, deputy director of the Comprehensive Coordination Office of the Management Committee of Lantan Characteristic Industrial Park in Shenmu City, was invited to attend the ceremony。Gao Jie, Secretary of the Party Committee of Sunjiacha Longhua Mining Company,Chairman Liu Xiaoyi,The person in charge of each EPC general contracting unit of the project,and more than 300 cadres and workers participated in the ceremony。

11.jpg

10 am,Beautiful wind and sunshine,Flowing colorful flags。Leaders and guests attending the ceremony at the gasification device、Power Center、Air separation unit area、110KV total variable、The central control room conducted visits and on-site guidance in sequence。

22.jpg

10:50,All parties are arranged neatly,The ceremony kicked off with the cheerful welcome march。

33.jpg

Deputy Secretary of the Party Committee of the Company、General Manager Wang Biqing’s speech。All members of the Project Preparation Office have clear goals,M88 loginStrong confidence,Invigorate your spirit,Work hard,Adopting the most advanced design concept,Gathering the best teams and first-class cooperative suppliers。All participating units fight hard in autumn and winter,Sweat in spring and summer,set off a boom in project construction,Turns design drawings into vivid real scenes step by step,A remarkable building、The large-scale modern coal chemical production base is in front of you。

At the ceremony,Each EPC general contracting unit、The supervision unit reported the project construction progress and supervision implementation status respectively。

44.jpg

Company Chairman、Liu Xiaoyi, executive director of Longhua Technology Company, pointed out in the report,Longhua coal classification and quality comprehensive utilization project as Shaanxi Province、Yulin City’s “14th Five-Year Plan” key projects,Remarkable results have been achieved so far。He said,The project resumed construction and was successfully put into production,It cannot be separated from the strong support and care of party committees and governments at all levels。He emphasized,Unless hard work is not enough to achieve success,Acting without responsibility is not enough to achieve success,From now to the first half of 2024,Is the critical stage of project construction,We must mobilize the efforts of the whole company,Break the rules、Day and night、Bold innovation,Safety、Quality guaranteed、Quality guaranteed、Reducing costs,No closing time for winter construction,Promote "press the fast forward button" and "run out of acceleration" in all aspects of project construction,M88 gameStrive to build an industry-leading chemical enterprise。

55.jpg

Gao Jie, Secretary of the Company’s Party Committee, delivered a speech。Gao Jie said,Since the swearing-in ceremony on January 31 this year,Longhua Technology Company keeps in mind our earnest instructions,Anchor target,Adhere to high standard positioning、Promote project construction with high efficiency,And vigorously promote the model worker spirit to the majority of builders、labor spirit、Craftsman spirit,The results achieved were affirmed。He hopes,We must take on stronger responsibilities、More refined work standards、More high energy and hard work,According to the overall goal of trial operation by the end of June 2024,Hurry up、Get real、Pay close attention to various preparations before driving,Make sure the project construction leaks are checked and filled、Single machine test run and linkage debugging in place、The whole factory test run plan is ready,Ensure the first-time success of project commissioning。

66.jpg

Deputy Director of the Management Committee of Shenmu Lantan Industrial Park、Li Yongzhi, Secretary of the Party Committee of Sunjiacha Town, delivers a congratulatory message,Hope Longhua Mining Company will achieve even better results,Make new contributions to the economic development of Shenmu。

Lifting into the sky with fireworks and brilliant columns of smoke,The ceremony ended successfully。

Adopting new stories based on time,Work hard and continue to work hard,Those who struggle are the happiest,The forging ahead Longhua is young。All employees attending the meeting and all participating units expressed their opinions,They will be courageous takers who seize the day、A down-to-earth doer,Complete the project construction work safely, efficiently, and with m88 casino reviewhigh quality,Strive to build "the country's leading energy and chemical enterprise" with a high-spirited attitude,Dedicated to the 30th anniversary of Longhua Group with outstanding achievements。(Xue Zhuang, Meng Xiaoyong, Guo Guangyao, Guo Yuxi, Xue Xiaocheng, Wang Jiaming)