Safe production
Your current location is:Homepage >> Safe production
Sunjiacha Longhua Mining Company won the award for safety work
Release time: 2024-03-28     Author: Wang Xinghua    Views: 2065    Share to:

22.png

March 26,Learned from Shenmu City’s 2024 Coal Work Conference,Sunjiacha Longhua Mining Company won the title of “Advanced Collective in Production Safety in 2023”,The acquisition of this honor fully reflects the high recognition of the local government and industry authorities for the company's safety production work、Full recognition and strong support for the mine’s various achievements。

Since 2023,Sunjiacha Longhua Mining Company is in production safety、Ecological governance、Technological Innovation、Quality improvement management、Industrial layout、In terms M88 loginof party building and other aspects, we have realized the improvement of "quality" to "new"、The goal of “stability” and “efficiency”,Mine “safety”、Quality、Equipment、Pay equal attention to production,The management ideas for overall promotion of all factors are further clarified,Guaranteed by a series of effective management systems such as the "Near Accident Management Measures" and the "Outsourcing Engineering Team Management Measures",Strengthen source management of hidden danger investigation,A total of 27 inspections of all aspects of the system were carried out throughout the year,409 troubleshooting problems and hidden dangers,Carry out warning education 41 times on a regular basis,Manage safety with a zero-tolerance attitude、Catch the scene,Investigated and punished 39 persons for various “three violations”,3 people transferred from their posts、Removed 4 people,Vigorously promote "dual card" security confirmation for job operations,Conduct a solid and comprehensive assessment of blind wearing of self-rescuers and full coverage,Organizational fire、6 emergency drills M88 loginfor floods and other accidents,The foundation of mine safety management is further consolidated;Pragmatic style of managers at all levels in the mine、Overcome difficulties,By carrying out "thinking reflection、Hidden danger inspection、Special Action to Rectify Work Style,Carry out risk analysis and judgment in advance、Develop feasible measures,Resolved the choke problem that restricted mine safety production,Comprehensive implementation of "775" working system in mine production,Using the "Sixty Days of Fighting and Gathering Strength to Improve Again" labor competition as the carrier,Overcame the lack of management experience in the mine’s first large mining height working face、10205 working surface main transport trough roof sinks、Team management levels vary、Sporadic projects with many sites and wide areas have high safety risks、Difficulty in supervision and a series of difficulties,Mine achieved safety、Orderly production。(Wang Xinghua)