Operation Management
Your current location is:Homepage >> Operation Management
m88 casinoInformation Technology Operation and Maintenance Branch: Work hard to improve quality and efficiency
Release time: 2024-08-01     Author: Feng Fengzu    Views: 1954    Share to:

Since this year,The m88 casinoInformation Technology Operation and Maintenance Branch thoroughly implements the "1116" work idea requirements of Northern Shaanxi Mining Company,Focusing on improving operation and maintenance quality and enterprise benefits,Changing ideas、Fix for weaknesses、Strengths and Weaknesses、Advantages、Increased efficiency,All work is progressing steadily。

640.jpg

Strengthen the foundation of safety,Build a solid line of defense for safety and environmental protection。Organize all employees to sign 151 production safety commitments,Signed the "Safety Production Responsibility Target Responsibility Letter" with each Zhiwei Center,Clear safety responsibilities at all levels。Revised and improved 7 important systems including the "Safety Performance Assessment Management Measures", "Safety Production Responsibility System" and "Ecological and Environmental Protection Responsibility System",Clear responsibilities and management processes。Carry out regular safety inspections,A total of 6 inspections in the first half of the year,Correct the problems found during the inspection as required。

Excellent service standards,Improve operation and maintenance service level。Organize personnel to actively participate in the “Operating Procedures and Safety Technical Measures Evaluation Activities” M88 gameof mining companies,Two contestants won the second prize respectively、Third Prize。Revised the "Incentive and Assessment Measures for Operation and Maintenance of the Intelligent Center" and "Measures for the Performance Appraisal and Management of Employees of the Intelligent Center",Improved the "Equipment Maintenance Management Measures" and "Special Production Instruments、Measures for the Management of Tools and Instruments》,Relevant documents on "Strengthening Monitoring and Monitoring System Management Standards and Early Warning Information Disposal" were issued,Ensure the standardization of operation and maintenance services。

Grasp project construction,Key tasks are being advanced in an orderly manner。In terms of intelligent work,Completed the compilation of the "Smart Center Responsibilities" and "Smart Mining Area Project Normalized Operation Responsibilities" manuals, modified the password-free login of the smart mining area cockpit and each subsystem, and automatically obtained the data of the special funds and operating cockpit。In project construction,Complete Zhangjiamao Mining Company’s “Intelligent Upgrading and Renovation of Tunnel Belt Machine on Tunneling Working Face” and “Intelligent Upgrading of Water Supply and Drainage Project”、Hanjiawan Coal Company’s “213109 fully mechanized mining face intelligent transformation project”, “information infrastructure upgrade and transformation”, “main coal flow intelligent expansion project” and other projects。In terms M88 appof scientific and technological research and development,Complete the "Full Life Cycle of the Intelligent System for Comprehensive Mining Working Faces (Construction"、Pick、Withdrawn) Research and Application of Standardized Process System》Preparation of Project Group Bid,And passed the external expert review,And the release of 17 group standards of the "Intelligent Coal Mine Operation and Maintenance Management Standard System"。

Strong business management,Promote efficient operation of enterprises。Actively implement 7 items and 24 items in the annual key work list。Insist on the assessment of deviation in fund contracting,Fund control、Implement cost reduction and efficiency improvement measures in material management and other aspects,Dynamic monitoring of various costs and expenses,All costs and expenses in the first half of the year were controlled within the cost reduction target。

Promote party building and lead,Gathering synergy for enterprise development。Implementing the “12353” key business KPI assessment system for party building,Solidly promote various annual party building tasks。Strengthen grassroots construction,Innovative Operation and Maintenance "Party Member Team Standardization Manual"、Carry out performance evaluation of party branch secretaries、Double Comment on Democracy、Annual Party Building Target Responsibility Assessment,Promote grassroots construction to be comprehensively excellent。Focus on style construction,Formulate the "Implementation Rules for Strengthening Team M88 loginBuilding", "Implementation Plan for "Five-type Organizations"" and evaluation standards for "Integrity Officers" in operation and maintenance,Focus on the group’s inspection of 17 common issues and comprehensive self-examination and rectification,Promote compliance management of various tasks。(Feng Fengzu)