Safe production
Your current location is:Homepage >> Safe production
Hanjiawan Coal Company Continuous Mining Team: Standardized "beautiful" creates new appearance
Release time: 2024-08-17     Author: Zhao Xinyue    Views: 1628    Share to:

Since the third quarter,The continuous mining team of Hanjiawan Coal Company solidly implements the "Six Lines of Work Method",Strive to create a high-quality excavation working face,“Beautiful” has a new look in safety production standardization。

555.jpg

m88 casino

The team makes full use of the pre-shift meeting time,Carefully organize all employees to thoroughly study the "Opinions" and "Hard Measures" of the two offices,Be "internalized in the heart,Externalize in action”,Lay a solid foundation for standardization creation work。

Based on "fine",Developed the "Measures for the Dynamic Standard Acceptance Assessment of Continuous Production Teams",Further clarify job responsibilities,Strictly implement "who manages"、Who is responsible” regulations,Ensure responsibility is implemented at all levels,Create "up-and-down linkage,A good atmosphere where everyone meets the standards。

Also,Strengthen the disclosure of team M88 appaffairs,Insist on monthly assessment and evaluation of safety production standardization work,Link assessment results to employees’ income,The fulfillment status will be announced on the team affairs public wall,To promote work implementation,Stimulate the enthusiasm and enthusiasm of all employees to participate in the creation of standardization。

666.jpg

Pragmatic execution and steady improvement

"There are still 3 issues left that have not been rectified,We must strictly follow the ‘Five Implementation’ principles,Ensure that rectification meets the standards on schedule。” Vice-captain Qiao Quanpeng emphasized。List of questions for the company’s safety production standardization inspection,The team responded quickly,Convened a rectification and implementation meeting for in-depth analysis。

"Pull-out force test 70KN,This anchor meets the standards;Torque force test 100N/m,The torque wrench is qualified..." in the Qiwei work group,Messages from the inspector Mao Feng pop up from time to time。In order to make the underground standardized acceptance work more accurate,The team’s innovative working methods,Send ledger records and on-site videos to the Qiwei work group in real time,Accept supervision by the whole team。

Actively encourage all employees to participate in innovation work,Contribute wisdom m88 casinoand strength to the creation of standardization。Faced with the challenge that the six-inch pipe in the expansion section cannot be hung normally,The team’s employees give full play to their talents,Cleverly put on "new shoes" for the six-inch pipe,The innovative achievement of "Six-inch Drainage Pipe Support Frame",The application effect has been highly praised by employees。

777.jpg

"Beautiful" appearance creates high-quality products

Into the continuous mining work surface,The lane in front of you looks clean and tidy,Materials are neatly stacked,The card boards are arranged in an orderly manner。The equipment in the chamber is complete,Cable hanging、The direction of the hairdryer and pipes is straight and clear。Continuous Mining Machine、Shuttle cars and other mining equipment are neatly arranged,Constitutes a beautiful and generous picture。

Come to the head of the belt conveyor,A standardized high-quality belt machine head comes into view。The protective net is colorful,New and beautiful。The above hanging "Adhere to people-oriented"、Keep in mind the twelve characters “life comes first”,Yellow background with red edges,Profound charm,Exceptionally eye-catching。

“Looking at the high-quality standardized work surface we have built together,Full sense of accomplishment and pride。Working in such M88 loginan environment,Safety and Guaranteed,We work with more confidence。" said Wang Jing, an employee of the continuous mining team。(Zhao Xinyue)