Provide strong support to fight the "tough battle" of production safety in the fourth quarter
Careful planning, everyone plays a good game of chess
Arrange technicians according to the mine pressure monitoring and early warning system and the actual daily progress of the site
The team organized technical forces in advance to prepare the "Final m88 sports betting app Measures for 223101 Mechanized m88 sports betting app Face"
Assign a special person to be responsible for material recovery during the final m88 sports betting app period of the working face
Work together to build a solid fortress of Mocai
The team will go through all steps in the process
Ensure that all kinds of electromechanical equipment will not "fall off the chain" at critical moments during the final m88 sports betting app period
Place the tools, tools and materials used for final m88 sports betting app in the designated working location in advance
Carefully organized to seize the last position in Mocai
Require on-site team members to keep an eye on on-site production safety conditions at all times
Provides a strong guarantee for the realization of the end m88 sports betting app of 223101 working face
The transport plane steadily transported away the last coal of the 223101 fully mechanized m88 sports betting app face