m88 casino
m88 casino review
Your current location is:Homepage m88 casino review
Hanjiawan Coal m88 casino review electromechanical operation team: Maintaining "family" well,There is a way to reduce costs
Release time: 2023-11-04     Author: Li Taoyan    Views: 4068 Share to:

Since this year,The electromechanical operation team of Hanjiawan Coal m88 casino review focuses on the main line of cost reduction and efficiency improvement,From publicity and education、Control costs、Device Management、Precise efforts in repairing old items and recycling them,Truly manage the "family" well,There is a way to reduce costs。

11.jpg

“The awareness of conservation must be rooted in the minds of employees,Through every detail of the work、implemented in every position。" said Wang Taiping, the leader of the team。

The team made full use of the pre-shift meeting、Study on Tuesday and Friday,Sharing through experience、Maintenance training、Video teaching and other promotional forms,Let the awareness of cost reduction and efficiency increase enter your mind, heart and career。

Print all information on both sides、Signature pen uses replaceable refills、Make sure the lights go out when people leave、People leave the agency..."Details determine success or failure,These seemingly trivial things,Over time, it is also the ‘catalyst’ to achieve cost reduction and efficiency improvement。" said Zhang Yao, an employee of the team。

The team strictly controls material costs,Reasonable monthly material submission plan。Whoever checks and accepts materials is responsible、Whoever signs is responsible,Put an end to substandard goods。Strictly assess and implement the use of team materials,Make sure the materials are put to practical use、Catch the details,Put an end to loss and waste at the source。

22.jpg

Strengthen daily maintenance of equipment,Prevent equipment from running without load for a long time,Based on the underground coal bunker position and specific production conditions,Properly arrange the start and stop of equipment,Neither affects production,It can also improve work efficiency。

Continue to carry out repair and recycling work,Pair switch、Water pumps and other equipment can be repaired independently and never outsourced。According to the district team’s “Reward Measures for Repairing Old and Recycling”,Reward maintenance personnel accordingly,Further mobilized the enthusiasm of employees to repair old items and reuse them。Since the third quarter,The team saved a total of 1 material cost.20,000 yuan、Electricity bill 0.50,000 yuan、Maintenance fee 0.80,000 yuan。

Next,The electromechanical operation team will adhere to refined management,Further exploring new ways to reduce costs and increase efficiency、New method,Making positive contributions to the m88 casino review’s completion of the annual cost reduction and efficiency improvement goals。(Li Taoyan)