Safe production
Your current location is:Homepage >> Safe production
Hanjiawan Coal Company Installation Team: Working hard to get started
Release time: 2024-02-19     Author: Yang Heng    Views: 2492    Share to:

Spring comes early for people who work hard,It’s time to strive forward。After the Spring Festival holiday,Although the taste of the new year is still strong,But the installation team of Hanjiawan Coal Company has started the "New Year's Day" state,Dedicate yourself to the resumption of production and work with a new look and full enthusiasm,Strive to be in the best condition,Winning a “good start” in the New Year。

11.jpg

Start and advance,Keep it safe。At the team’s deployment meeting for collecting fakes and collecting hearts,Publish and implement the spirit of superior documents、Safety Management Red Line、Operation procedures and safety technical measures,Watch the safety warning educational film and comment on it,Becomes the highlight of the resumption of work and production。

"At present, M88 Online Live Casinoall cadres and workers on the team have arrived at their posts safely on time,The installation team will focus on the annual key work,Keep the safety confirmation checkpoint,Actively investigate hidden dangers on site,Better heart control、Juli、Start again。" Captain Feng Xiaocheng said。

The new college students who joined last year have adapted to the various tasks of the installation team,Under the careful guidance of the masters,lost childishness,Take root in their respective positions,Continuously tempering skills,Fighting at the forefront of the new year。

Underground 2-2Coal glue transportation main road reinforcement and support site,The first thing that squad leader Cao Yanpeng did when he arrived at work was to review the changes in the reinforcement and support of the gang,Check whether there are any safety hazards in the surrounding area,Team members work together to carefully check the condition of tools and equipment,Ensure nothing goes wrong during the operation。

22.jpg

223101 Equipment train station for mining preparation,Ou Qigang, the leader of the electromechanical team, is leading the comprehensive mining maintenance electricians to inspect the power supply system,Check the integrity M88 Online Live Casinoof the electrical switches of the equipment train one by one,Record every data of the missed test in detail,Ensure every switch、Each device can achieve normal hot standby indicator status。

223102 Belt Slot 1300m,After hardening squad leader Yang Yanpo led the team members to confirm the environmental safety of the sections to be hardened,Then dredging and finishing started、Support hardened template、Protect surrounding transportation...Don’t be careless in every process,Ensure hardening quality meets standards。

In the team’s ground maintenance warehouse,Team members and ground workers are clearing away snow and ice in the shade,Check the warehouse cable laying and fire protection facilities configuration,Inventory and check the storage and use of materials in the warehouse,No blind spots,Ensure the supply of materials on site underground。

The first spring of the year,Everything comes first。On the occasion of resumption of work and production,All the cadres and workers of the installation team "change their work style"、Promote implementation、The attitude of opening a new game,Insist on carrying the responsibility on your shoulders、Keep safety in mind、Take the task in hand,Fighting for a m88 online sports bettingnew start,Write a new chapter。(Yang Heng)