Safe production
Your current location is:Homepage >> Safe production
Hanjiawan Coal Company strictly controls the "three gates" of on-site safety management
Release time: 2024-10-10     Author: Yang Heng    Views: 1270    Share to:

Since the launch of Operation "100 Days of Safety",Hanjiawan Coal Company strengthens work site management,Multiple angles、Consolidate the safety management and control system in depth,Make full use of technicians、Team leader、The role of security inspectors in on-site safety management,Multiple measures have helped the mine safety production situation continue to improve steadily。

111.jpg

M88 login

"We have compiled and printed a set of "Safety Production Inspection Tool Book",Organize and carry out special training on reference books,Improve the professional capabilities and level of engineering and technical personnel,Provide strong basis for controlling technical barriers。" said Li Huigang, deputy chief engineer of the company。

Recently,223101 fully mechanized mining working face enters the goaf area of ​​the overlying working face、Coal pillar stress superposition area,Department technical staff and district team technicians jointly deal with water accumulation in the goaf area、Safety risks such as support in the advanced area of ​​the working surface,Develop a special risk identification report in advance,Standardize safety technical measures,Implement on-site safety m88 sports betting appcontrol measures。Strengthen risk area management,Regularly update the "four-color map" of risk points and risk areas,Ensure water prevention and control during extraction、Roof management and other risk management controls are in place。

The Production Geometry Management Department aims at the hidden disaster-causing factors that have been discovered underground,Predict the possible risks in the mining head face and high-risk operation areas in advance,For water prevention and control、"One pass and three defenses"、Census results of hidden disaster factors such as roofs,Prepare safety technical measures in advance,Provide guarantee for safe production on site。

Control on-site construction

The company takes the opportunity of establishing a national three-level safety management standardization team,Refining the construction quality acceptance requirements of each team,Class inspection and assessment、Daily inspection cashing。In 223101 fully mechanized mining working face,The team leader keeps an eye on the scene,Strictly control mining height,Adjust the cutting and support status of the coal machine in a timely manner,Strictly implement the "three straights, one level, one clean and two smooth" on-site standardized management,Ensure construction quality reaches dynamic standards。

Each district team further improves the quality of the "Eight-Step Working Method" before classes,Pay attention to "learning、Back Drawing M88 gameand Comments” link,The personnel on duty emphasized safety precautions and work procedures to the personnel on duty,Guide employees to know the standards、Understand standards、Use standard。

On the basis of completing the established mission goals,Refining the assessment content of team standardization tasks,Optimize incentive measures,Good for completion、Higher construction standards、A team with obvious results in work advancement,Give certain bonus points as reward,Fully mobilize the enthusiasm and initiative of team members。

222~1.jpg

Keep supervision and inspection in check

In terms of on-site safety management,The security inspector team closely integrates the actual situation,Proficiently apply the knowledge learned to daily accident hazard investigation,Check the site according to the procedures,Control site test standards,Upload the discovered problems to the "Double Prevention" information management platform in a timely manner,Realize hidden dangers” entry、Rectification、Acceptance、Closed account” closed-loop management。

At the work site,The security inspector follows the "Special Regulations on Underground Mining Support Operations" issued by the company,Strengthen the management of mining head and roof,Resolutely implement the "Five Strict Prohibitions" on coal mining operations、“Ten Strict Prohibitions” on Excavation Operations,Keep the passage gates for safe production on site。

Next step,Hanjiawan m88 live casino and sports bettingCoal Company will continue to optimize labor organization,Strengthen project management,Standard supervision and inspection,For special periods、Mark important positions in front,Continuously improve safety management capabilities,Ensuring the "100 Days of Safety" campaign is effective。(Yang Heng)