m88 casino
Operation Management
Your current location is:Homepage Operation Management
First place in the intelligent rapid excavation arena!How does this m88 review win
Release time: 2023-10-09     Author: Chen Ziliang Guo Hongxin    Views: 2838 Share to:

Days ago,Shaanxi Coal Mining announced the evaluation results of the Intelligent Rapid Tunneling Competition Platform and Excellent Management Units in the second quarter of the 2023 "Special Activity to Improve the Level of Intelligent Rapid Tunneling",The comprehensive excavation m88 review of Hanjiawan Coal Company won the honor of "First Place in the Intelligent Rapid Excavation Competition Platform"。

Since the second quarter,The comprehensive excavation m88 review of Hanjiawan Coal Company strictly implements the job safety production responsibility system,Vigorously promote the construction of m88 review safety network、Zero "three violations" m88 review creation,Implementing “one meeting and two lists”、"Level 3 Helper" for Unsafe People,Carry out m88 review “safety partner” activities,Ensuring the safe production of the district m88 review。Practice full life cycle management of equipment,Continuously refine maintenance projects、Standard maintenance process、Compacting and maintenance responsibilities,Improve equipment integrity rate and startup rate,Give full play to the role of intelligent rapid excavation equipment in reducing manpower and improving efficiency and security。

11.png

Optimize the staffing of each m88 review,Strengthen the labor organization at the job site,Strengthen the connection and coordination of various work processes,Ensure that excavation and transportation are carried out simultaneously,Continuously improve the efficiency of fast digging。Strengthen on-site shift management,Full-time inspector checks tunnel molding quality in each shift、Support quality、Inspect civilized production conditions, etc.,And use the work group to publish the on-site safety production status in real time,Forcing each m88 review to strengthen their sense of responsibility,Promote efficiency improvement through standardized cycles。

Give full play to the wisdom and power of all employees,Actively carry out collection of golden ideas、Small reforms, small reforms、Technological innovation and other activities,More than 30 innovative projects including "Belt Pull Movement Quick Adjustment Device", "Sliding Dust Removal Dryer Device" and "Cooling Water Centralized Recovery Device" have been formed,Significantly improved work efficiency。Combined with the actual production safety of the district m88 review,Develop a stepped incentive method,Set reasonable plans and goals at the beginning of each month,Integrate safety management of each m88 review at the end of the month、Task indicator、Project quality and other work conditions will be assessed and cashed out,Effectively stimulate the enthusiasm and initiative of each m88 review。

22.png

Keep a tight grip on the "big nose" of cost reduction and efficiency improvement,Strictly implement the material requisition approval system,Implementing “handing over the old and receiving the new”,And develop material plans as needed based on the consumption of materials and accessories,Reduce idle material and accessories inventory。Focus on repairing old items and recycling them,For used switch rack、Fence、Repair and reuse after crossing the bridge,Squeeze out the remaining value of materials and accessories。Play the role of on-site supervision by m88 review members and inspectors,Pay close attention to the use process of materials and accessories,Put an end to unnecessary waste,And include the m88 review’s consumption of materials and accessories into the monthly performance appraisal,Comprehensively improve the safety and production efficiency of the district m88 review。

Next step,The comprehensive excavation m88 review will carefully summarize and learn from advanced experience,Retracement from quick excavation equipment installation、Inspection and maintenance use、On-site labor organization、Joint optimization and improvement in talent training and other aspects,Continuously improve the effect of intelligent quick mining application,Continuously improve tunnel quality and excavation level,Make every effort to ensure the safe production and continuation of mines,Assist the company to create a new sample of high-end first-class intelligent mines of the same scale with all coal。(Chen Ziliang Guo Hongxin)